Skip over navigation

Package Details

Back to Packages

Package # VB-S-C-2017-Mobile Crusher Maintenance QBE Nomination Closing Date
Title Mobile Crusher Maintenance Tender Issue Date TBA
    Bid Closing Date TBA

For more information contact: Dwayne Chiasson
709-896-6426
709-752-3459
click here to send email

Contract Scope

1.     general

    1. Without limiting the generality of the foregoing, the Work to be provided by the Contractor shall include the provision of all management, supervision, administration, technical expertise and support, skilled labour, materials, consumables, equipment, services, tools, and each and every item of expense necessary, other than that stipulated in the Contract Documents as provided by the Company, to complete the Work of this Contract.

2.     ScHEDULE

2.1.    Performance of the Work shall be in accordance with the following schedule:

2.1.1.         Work Start:  1 Aug 2017

      1. Work Complete:  30 Aug 2020

         

  1. SCOPE

    1. Detailed Scope of Work to be performed by the Contractor shall include the following:

    2. An annual site visit by a field service tech to perform an inspection and assessment on one pit MVP 450 Cedarapids  roller cone crusher, one EL-RUSS  3054 Jaw Crusher, one ELRUS 48”X 20’ vibrating grizzly screen and one Cedarapids Terex flat screen.

    3. Follow up with a field service report on findings and recommended repairs required.

    4. Contractor to provide the annual maintenance services and necessary repairs required on the equipment listed in Item 3.2. Including but not limited to welding and mechanical work.

    5. Contractor must provide competent personnel with mobile crusher maintenance experience.

       

4.         COMPANY FURNISHED SERVICES & FACILITIES

    1. The Company will provide the Contractor, at no cost, specifically for the performance of the Work of this Contract, the following Services and Facilities:

      1. As per general contract.

      2. Support equipment and operators for such equipment as forklift, boom truck, genie,etc.

         

  1. Company furnished equipment & tools

    1. The Company will provide the Contractor, at no cost, specifically for the performance of the Work of this Contract, the following Equipment and Tools:

    2. All additional equipment, tools and spare parts required for the Contractor to perform the scope of work that as recommended by the Contractor.

       

  2. COMPANY FURNISHED CONSUMABLES & MATERIALS

    1. The Company will provide the Contractor, at no cost, specifically for the performance of the Work of this Contract, the following Equipment and Tools:

      1. All consumables required as recommended by the Contractor.