Skip over navigation

Package Details

Back to Packages

Package # VB-S-C-2017- Fire Suppression QBE Nomination Closing Date
Title Fire Suppression on Mobile Fleet Tender Issue Date TBA
    Bid Closing Date TBA

For more information contact: Dwayne Chiasson
709-896-6426
709-752-3459
click here to send email

Contract Scope

1.     general

    1. Without limiting the generality of the foregoing, the Work to be provided by the Contractor shall include the provision of all management, supervision, administration, technical expertise and support, skilled labour, materials, consumables, equipment, services, tools, and each and every item of expense necessary, other than that stipulated in the Contract Documents as provided by the Company, to complete the Work of this Contract.

2.     ScHEDULE

2.1.    Performance of the Work shall be in accordance with the following schedule:

2.1.1.         Work Start: October 1, 2017

      1. Interim, Milestone(s) April 2, 2018

      2. Interim Milestone(s) October 2, 2018

      3. Interim Milestone(s) April 2, 2019

                         Work Complete October 2, 2019

         

         

                           

         

         

3.     Scope

    1. Detailed Scope of Work to be performed by the Contractor shall include the following:

      1. To Semi Annually inspect, certify and repair (upon approval) the Ansul Fire Suppression Systems on 41 pieces of mobile equipment

         

      2. Attached is a form with the existing 41 pieces of equipment to be inspected at this time. As machines are replaced the actual models of the machines may change but the vendor charges will encompass 41 total machines.

 

      1. The vendor will produce an inspection condition report on each machine inspected, detailing the required repairs, required parts with part numbers, labor hours to repair, and cost estimate to repair.

 

      1. Certificates are to be issued from the vendor no later than 15 days from certification of machine.

4.   COMPANY FURNISHED SERVICES & FACILITIES

4.1.      The Company will provide the Contractor, at no cost, specifically for the performance of the Work of this Contract, the following Services and Facilities:

4.1.1.      Living accommodations and meals on site

      1. Means of transportation and working area while on site

5.     Company furnished equipment & tools

5.1.      The Company will provide the Contractor, at no cost, specifically for the performance of the Work of this Contract, the following Equipment and Tools:

      1. Contractor technicians are to supply their own tools and company will supply any heavy hand tools that are available at site, and are needed to complete the work.

 

6.    COMPANY FURNISHED CONSUMABLES & MATERIALS

6.1.    The Company will provide the Contractor, at no cost, specifically for the performance of the Work of this Contract, the following Equipment and Tools:

 Material or consumables needed to perform the work.

 

7.     OTHER

7.1.      [Contractor site employee is to have a Voisey’s Bay full medical during the life of this agreement]