| Potential Sources | Downstream Locations |
| Otter Pond | Reid Brook |
| Camp Pond | Reid Brook |
| Camp Brook | Reid Brook |
| Reid Brook at the mouth | Reid Brook |
| Pond 70 | Throat Bay Brook |
| Pond 71 | Throat Bay Brook |
| downstream of Dam 3 | Pond 67 Brook |
| upstream of Pond 67 | Pond 67 Brook |
| Pond 67 | Pond 67 Brook |
| downstream of Dam 6 | Option 5 Brook |
| Pond 58 | Option 5 Brook |
| downstream of Dam 2 | North Tailings Basin Brook |
| downstream Pond 57 | North Tailings Basin Brook |
| Watershed | Arctic Charr | Brook Trout | Lake Trout | Round Whitefish | Threespine Stickleback a | Ninespine Stickleback a |
| Reid Brook, Southern Watershed |
A, R R |
A, R R |
R | R |
R |
R |
| Ponds 68-69 Brook | R | R | R | R | ||
| Pond 64 Brook | R | R | R | |||
|
Pond 58 Brook, Pond 67 Brook |
A (smolt), R | R | R | |||
| Option 4 | A, R | R | R | |||
|
A = anadromous, R = resident. a Threespine and ninespine stickleback can tolerate brackish and salt water but most were caught in freshwater, distant from the sea. |
||||||
| Life Stage | Seasonal Occurrence | Habitat | Diet |
|
Spawning/Egg Incubation Hatching (alevin) |
October 1 - November 15: October 1- June 15 April 15 - June 15 |
gravel; usually in main channels of streams with current, upwelling; shoals in ponds | n/a |
| Fry | post-hatching | streams/ponds; cover under rocks or stones, or in interstices | zooplankton, very small insect larvae |
|
Juvenile (2-6 years) |
year round residents in freshwater | streams and associated small tributaries; rocky regions along shorelines of ponds | zooplankton, amphipods, sticklebacks, benthic invertebrates |
|
Smolt/adult (marine) |
travel to sea during spring runoff (May-June) | in the sea - remain close to coastlines in relatively shallow water | capelin, sand lance, sculpin, euphausid shrimp, amphipods and krill |
|
Smolt/adult (freshwater) |
return to freshwater during July-August; sub-adults return after adults; remain in freshwater over winter | main channels of streams with gravel, sand and cobble bottoms; overwinter in large/deep pools |
do not feed in freshwater |
| Sources: Scott & Crossman 1973; McCubbin et al. 1990; Johnson 1980; JWEL 1997a | |||
| Watershed | Average Standing Stock Value (g/100 m2) |
Range of Standing Stock (g/100 m2) |
||
| Reid Brook | 251.2 | 10.4-748.8 | ||
| North Tailings Basin | 257.7 | 56.4-390.4 | ||
| Pond 65 | 819.5 | 689.3-950.6 | ||
| Option 5 | 210.3 | 104.5-347.6 | ||
| Little Reid Brook | 238.4 | 100.8-399.4 | ||
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Loss |
|
|
| Fish Loss |
|
|
| Habitat Modification |
|
|
|
|
|
|
|
|
|
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Modification |
|
|
|
|
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Modification |
|
|
|
|
|
|
|
|
|
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Loss |
|
|
| Fish Loss |
|
|
| Habitat Modification |
|
|
| Underground Mining |
|
|
|
|
|
|
|
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Modification |
|
|
|
|
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Modification |
|
|
|
|
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Modification |
|
|
|
|
| Potential Environmental Effect |
Project Phase |
Activity |
| Habitat Modification |
|
|
|
|
| Project Phase | Residual Environmental Effect | Significance |
Likelihooda (Probability) |
Sustainable Use (Capacity) of Renewable Resourcea |
| Construction |
|
negligible (not significant) |
n/a | n/a |
| Operation |
|
minor (not significant) |
n/a | n/a |
| Decommissioning |
|
negligible (not significant) |
n/a | n/a |
| Post-Decommissioning |
|
minor (not significant) |
n/a | n/a |
| Accidental Events |
|
negligible (not significant) to major (significant) | low | high to low |
|
a likelihood and sustainable use of renewable resources are only defined for environmental effects that are significant (moderate or major) (CEAA: 1994: 84, 187) Note: Without a compensation plan the residual environmental effect for only Headwater Pond would be:
|
||||
| Project Phase | Residual Environmental Effect | Significance |
Likelihooda (Probability) |
Sustainable Use (Capacity) of Renewable Resourcea |
||||
| Operation |
|
negligible (not significant) |
n/a | n/a | ||||
| Decommissioning |
|
negligible (not significant) |
n/a | n/a | ||||
| Post-Decommissioning |
|
moderate (significant) |
high | high | ||||
| Accidental Events |
|
negligible (not significant) to major (significant) | low | high to low | ||||
|
a likelihood and sustainable use of renewable resources are only defined for environmental effects that are significant (moderate or major) (CEAA: 1994: 84, 187) Note: Without a compensation plan, the residual environmental effect for only the North Tailings Basin (Pond 55 and Pond 56 only) would be: |
||||||||
| Project Phase | Residual Environmental Effect | Significance |
Likelihooda (Probability) |
Sustainable Use (Capacity) of Renewable Resourcea |
| Construction |
|
negligible (not significant) |
n/a | n/a |
| Operation |
|
negligible (not significant) |
n/a | n/a |
| Decommissioning |
|
negligible (not significant) |
n/a | n/a |
| Post-Decommissioning |
|
moderate (significant) |
n/a | n/a |
|
|
||||
| Accidental Events |
|
negligible (not significant) to major (significant) | low | high to low |
|
a likelihood and sustainable use of renewable resources are only defined for environmental effects that are significant (moderate or major) (CEAA: 1994: 84, 187) |
||||
| Project Phase | Residual Environmental Effect | Significance |
Likelihooda (Probability) |
Sustainable Use (Capacity) of Renewable Resourcea |
|||
| Operation |
|
minor (not significant) |
n/a | n/a | |||
| Decommissioning |
|
minor (not significant) |
n/a | n/a | |||
| Post-Decommissioning |
|
minor (not significant) |
n/a | n/a | |||
| Accidental Events |
|
negligible (not significant) to major (significant) | low | high to low | |||
|
a likelihood and sustainable use of renewable resources are only defined for environmental effects that are significant (moderate or major) (CEAA: 1994: 84, 187) |
|||||||
| Environmental Effects Criteria | |||||||
|
Project Phase |
Project Activity |
Environmental Effect | Magnitude | Geographic Extent |
Timing/ Duration/ Frequency |
Reversibility |
Ecological/ Social/ Cultural Context |
|
Construction |
stream crossings and earthworks | siltation leading to habitat alteration | low |
Reid Brook Little Reid Brook North Tailings Basin Throat Bay Brook |
throughout construction, intermittent | high | subsistence harvesting |
|
Operation |
mine rock/ tailings disposal |
fish mortality | high |
North Tailings Basin Headwater Pond |
indefinitely | nil | subsistence harvesting |
| seepage | habitat alteration, chronic effects on fish | low |
Throat Bay Brook Pond 67 Brook North Tailings Basin |
throughout operation | low | subsistence harvesting | |
| Decommissioning | removal of stream crossings and earthworks | siltation leading to habitat alteration | low |
Reid Brook Little Reid Brook North Tailings Basin Throat Bay Brook |
throughout decommissioning | high | subsistence harvesting |
| seepage | habitat alteration, chronic effects on fish | low |
Throat Bay Brook Pond 67 Brook North Tailings Basin |
throughout decommissioning | low | subsistence harvesting | |
| Post-decommissioning | Pit flooding | habitat alteration, chronic effects on fish | low | Camp Pond, Camp Brook | 100 years | low | subsistence harvesting |
| Release of impounded water | habitat alteration, chronic effects on fish | low to medium |
Throat Bay Brook North Tailings Basin Brook |
100 years | low | subsistence harvesting | |
| seepage | habitat alteration | low |
Throat Bay Brook Pond 67 Brook North Tailings Basin |
100 years | low | subsistence harvesting | |